Planning Permission When Buying a Home
A house that was built or altered without planning permission can be difficult to mortgage and difficult to sell. Planning is therefore one of the first things a buyer's solicitor examines.
What a buyer's solicitor checks
For any property built or altered since 1 October 1964 a buyer is entitled to evidence that planning permission was obtained, or was not required, and that its conditions were met. We examine the grant of permission, confirm that any financial contributions levied by the local authority were paid, and look for a certificate or opinion from an architect or engineer that the house was built in substantial compliance with the permission and with the Building Regulations. A planning search against the property shows the applications made, any enforcement history and what is proposed nearby.
Extensions, conversions and exempted development
Not every alteration needs permission. The planning regulations exempt certain works to a house, the most common being a single storey extension to the rear of up to 40 square metres, subject to conditions as to height, the open space left behind the house and any earlier extensions. The conversion of an attached garage, a small porch, and a shed or garden room within stated limits may also be exempt. A buyer should not take a seller's word that works were exempt. We ask for an architect's or engineer's certificate confirming that the works come within the exemption and comply with the Building Regulations.
Building control
Since 1 March 2014 most new houses and larger extensions require a commencement notice and, unless the owner opted out as the rules later permitted for a single dwelling or a domestic extension, a statutory Certificate of Compliance on Completion registered with the building control authority. A new home should not be closed without it. Where the opt out was used, an opinion on compliance from a suitably qualified professional takes its place.
Unauthorised development
Where works were carried out without permission, the usual remedy is an application for retention permission, which the seller should make before the sale. It is often said that unauthorised works are safe after seven years. That is only partly true. The planning authority generally cannot take enforcement action once seven years have passed, but the development remains unauthorised. It cannot be extended in reliance on the exemptions, a lender may decline it as security, and a future buyer may refuse it.
Protected structures and conservation areas
For a protected structure, works that would materially affect its character need permission even where they would otherwise be exempt, and that extends to the interior. In an architectural conservation area the exemptions for external works are also restricted. A buyer of a period house should ask what was done to it and on what authority, and may seek a declaration from the planning authority as to what works can be carried out without permission.
A changing code
The Planning and Development Act 2024 is replacing the Act of 2000 in stages, and the exempted development regulations are under review. The position on any property should be checked against the law in force when the works were done and when the sale takes place.
Common questions
Do I need planning permission for an extension?
Not always. A rear extension of up to 40 square metres may be exempt if it meets the conditions in the regulations. An extension to the front or side, one that exceeds the limits, or works to a protected structure will ordinarily need permission.
What is a certificate of compliance?
It is a certificate or opinion from an architect, engineer or building surveyor that a house or extension was built in substantial compliance with its planning permission, or was exempt, and with the Building Regulations. Buyers and lenders expect one for the house and for each later alteration.
Can I sell a house with an unauthorised extension?
It can be done, but the buyer's solicitor will raise it and the buyer's lender may refuse to lend. The cleaner course is to apply for retention permission, or to obtain professional confirmation that the works were exempt, before the property goes to market.
Reviewed by Robert Bourke, Principal Solicitor, on 14 November 2026.